Electrical Engineering
Extension of the 11kV supply line from the detox area to the seepage well, including pole erection, a pole-mounted transformer and a DB shelter.

Germatek extended Adamus Resources' 11kV supply line from the detox plant to the seepage well. The work covered pole erection and dressing, conductor stringing, installation of a pole-mounted transformer, and the construction of a shelter for the distribution board at the well.
Scope of work
- Pole erection and dressing
- 11kV conductor stringing
- Pole-mounted transformer installation
- Distribution board and shelter
- Testing and energisation