Electrical Engineering
Design-to-commissioning power supply for the E&P laydown area — transformer installation, MV terminations, overhead line works and LV distribution.

Cardinal Namdini engaged Germatek to provide permanent power to its E&P laydown installations in the Upper East Region.
Our team installed and connected the pole-mounted and ground-mounted transformers, built the MV overhead line sections, terminated the MV and LV cables, and installed the distribution panels feeding the laydown facilities. Live-line work was carried out from elevated work platforms, and the full installation was tested before energisation.
Scope of work
- Ground- and pole-mounted transformer installation
- MV overhead line construction
- MV cable terminations at switchgear
- LV distribution panels and cabling
- Testing and energisation